PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Metal Clips around the perimeter of the roof (South Elevation) (800x600).jpg Metal clips aroung the perimeter of the 3rd Floor Facing West (800x600).jpg Patching of Stair -2 (800x600).jpg Patching Stair -2 (800x600).jpg Roof perimeter without the steel plates to support the metal decking (800x600).jpg Started installing duct work at the 1st Floor Facing South-East (800x600).jpg Welded metal clips around the perimeter of the 4th Floor (North Elevation) (800x600).jpg
Previous pageNext page Roof perimeter without the steel plates to support the metal decking (800x600)
Roof perimeter without the steel plates to support the metal decking (800x600)